Ulu Pandan Incineration Plant :
Design Data & Plant Equipment
Incineration capacity per day : 1600 tonnes
Number of incerator units : 4
Average Calorific Value of Refuse : 8,000 KJ/KG
Steam Generation per boiler : 30 tonnes/hr
Live Steam Pressure : 34 bar
Live Steam Temperature : 370 oC
Power Generation Capacity : 16 MW
Generator Voltage : 6.6 KV
![]()
Main Plant Equipment
Refuse handling : 3 weightbridges of 40 tonnes capacity each
: 13 refuse discharge bays
: 2 refuse cranes with 3 tonnes capacity each
: 1 bulky waste crusher with 20 tonnes/hr capacity
Refuse Incineration and Steam Generation : 4 intergrated roller grate incinarator cum boiler units
Flue Gas cleaning : 1 twin-zone electrostatic precipitor to each flue gas cleaning unit with a dust separation efficiency of 99.5%
: 1150 metres concrete chimney with firebrick inner-lining
Ash handling Plant : 1 wet-type ash extractor and 2 ash conveyers to each unit
Scrap metal recovery : 2 magnetic separators for each unit
Power generation : 1 generator of twenty MVA capacity
: 1 reducing gear 7552/1500 rpm linking turbine and generator
Steam condensation : 4 air condensers
Cooling system : Effluent water from the Ulu Pandan Sewage Treatment works
:Town water
Introduction Landfills and Recycling Land Pollution
__ Maps - Where are they located
__ Conclusion
__ Glossary